Home Services Mine Design

Mine Design

Mine Design

Three parts of mine design: feasibility study, preliminary design, and construction plan,
The key to mine design is all must be established on the basis of detailed investigation, and therefore Xinhai Mine Design Institute will firstly take a comprehensive field study to the mine of clients including the crude ore for dressing plant, site, water, electricity, traffic, geography, etc.
These investigation contents need the cooperation of geology, mining, ore dressing, smelting, machinery, civil engineering, electric power and other departments.

Read More

WHY CHOOSE US?

In the feasibility study stage, first, Mine Design Institute and the client need to sign the entrustment agreement. After the two sides reaching an agreement, Xinhai Mine Design Institute starts to establish a working group for work including: planning, investigation, data collection, planning and optimization, project evaluation, "report" writing, and exchanging views with commissioned units to form a formal report.
In all the work of the working group to carry out, investigation, data collection and plan optimization is the most important basis for selecting plant construction scheme. For these important parts, the working group requires different professional division and cooperation, including:

After "Feasibility study report" approved, Mine Design Institute starts preliminary design and comes up with the design of dressing plant construction. Design mainly involves dressing, general layout, electric power, communication, civil engineering, environmental protection, water supply and drainage, tailings, safety and fire protection, investment estimates, economic benefit. For the improvement and extension enterprises, the preliminary design will illustrate the status, characteristics, plant, main problems, utilization of main buildings and equipment.
Xinhai Mine Design Institute has many engineers who can design different types of dressing plants (less investment, quick capital return or easy management) according to clients' requirements. what's more, the design cost is lower than the national standard.
After the completion of the preliminary design, Design Institute experts will gather all content to form the detailed "Preliminary design report " submitted to the competent department of Mine Design Institute.

Our Service

Mineral Processing EPC

Mineral Processing EPC

ReadMore
Solutions

Solutions

ReadMore
Products

Products

ReadMore
Contact us

Contact us

ReadMore

© 2017 Shandong Xinhai Mining Technology & Equipment Inc.